![](https://blogs-dev.ei.columbia.edu/wp-content/uploads/2016/12/student-site-visit-to-Pratt2-200x150.jpg)
Students Advise County on Permeable Pavement
The biggest barrier to installation or permeable pavement is funding. But the positive outcomes include reduced flooding, less stormwater runoff, and recharging of aquifers.
The biggest barrier to installation or permeable pavement is funding. But the positive outcomes include reduced flooding, less stormwater runoff, and recharging of aquifers.